The Town Hall announced 28th August 2019 the following:

(Google translation follows – you can read the original at:
http://www.mazarron.es/es/ayuntamiento/noticias/EL-PLENO-APRUEBA-INICIAR-EL-PROCESO-PARA-LA-CONSTRUCCION-DEL-MUSEO-QUE-ALBERGARA-EL-MAZARRON-II/?fbclid=IwAR0kBSHvFj1_gH9TEx0SNq22a5rcKyV7rigYZut7pcBaAR67mnfpJXMpY-M

A work table for Camposol with all administrations and neighbours will face the needs of urbanization.

 The Plenary unanimously approved a motion that also came from all political groups that determined the establishment of a work table to study and analyze the situation of the urbanization of Camposol at the level of Infrastructure and Services to alleviate their needs and that will be represented by the City Council, the CARM, the Segura Hydrographic Confederation and representatives of the associations of the aforementioned urbanization.

The councillor of Camposol, Silvana Buxton, thanked the municipal corporation “the approval of the constitution of this work table that we need a lot in Camposol” since it is in line with what determines the report issued at the time by the Regional Assembly in regard to the situation of urbanization. Buxton hoped that all administrations “work together to plan solutions to the different problems that Camposol has”.